Download Print this page

Installation - DCI Edge SERIES 4 Installation Instructions Manual

12 o’clock cabinet

Advertisement

SERIES 4 & SERIES 5 12 O'CLOCK CABINET
Installation Instructions

INSTALLATION

PREPARATIONS
1
Remove cabinet modules from their packaging.
Identify the hardware kits and provided literature.
2
WALL HANGING RAIL
For cabinets which include a Support Wall, skip to the next page.
Identify the location of the wall studs in the wall to which the cabinet will be mounted and make a mark 71-1/2" from
1
the floor at the center of each stud.
Identify the vertical centerline of the cabinet position on the wall, and make a mark on the centerline which is 71-1/2"
2
from the floor. Draw a level, horizontal line at the height of your centerline mark.
3
Locate the 40" hanging rail and place it against the wall with the hole centers of rail aligned with the horizonal line.
Find the midpoint on the hanging rail and align it with your centerline mark. Identify the holes in the hanging rail
4
which align to the marks you made for your studs. Keep the rail midpoint as close to the centerline mark as possible.
Mount the rail to the wall using the lag screws provided. Use toggle bolts between studs to maximize strength as
5
necessary.
6
WARNING: Always lift cabinets by the bottom edge, being careful to lift with your legs and not your
back. Do not lift from the underside of the counter.

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Series 5