Installation; Dimensional Clearances; Machine Foundation; Machine Anchoring - ALLIANCE UM202 series Installation Operation & Maintenance

Washer extractors twin tub
Table of Contents

Advertisement

Dimensional Clearances

Dimensional Clearances
A
B
C

Machine Foundation

The machine may be placed on any level floor as long as floor
will hold the weight of the machine.
Position the machine and level with shims or grout under the cor-
ners.
Floor Load Data
Specification
Static floor load
Static pressure

Machine Anchoring

Bolting to floor is optional. To bolt down the machine, use 3/8
inch bolt holes located on the frame at the bottom of each corner.
One quarter inch machine anchors should be used.
©
Copyright, Alliance Laundry Systems LLC -
DO NOT COPY or TRANSMIT

Installation

A
Dimensional Clearances [Refer to Figure 5 ]
6 in. [152 mm]
.5 in. [13 mm]
6 in. [152 mm]
840 lbs. [3.7 kN]
68 lbs-ft2 [3.3 kN-m2]
Table 6
B
Figure 5
Table 5

Shipping Block and String Removal

To avoid severe personal injury and machine dam-
age, remove the shipping block and shipping string
before connecting power to the machine.
The shipping string is provided to open lid before power is con-
nected to machine. Operating machine with shipping string in-
stalled will prevent the wash basket from stopping when lid is
open.
To open lid before power is connected, pull the shipping string to
the left and hold, then lift lid open.
IMPORTANT: If machine is operated with shipping
block in place, damage to machine, tub and drive mo-
tor may result. To avoid damage to machine, remove
shipping block before operation.
15
C
CAR22N_SVG
WARNING
F8221501ENR4
Installation
W754

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents