Step 7. Mounting the Display onto the Articulated Arm
Lower the Display so that the Hook
If necessary, adjust the horizontal
Plate locates with the Mounting
angle of the Mounting Rail so that
Head.
the Display is level.
Hook
Plate
Mounting
TIP: Use a Spirit Level to
Head
check the Display is level.
Step 8. Cable Management
Connect cables to your Display and
Remove Cable Covers using a Phillips Head Screwdriver, and route
route through Cable Clips.
the cables along the length of the arms. Reattach the Cable Covers
to hold the Cables in place.
Cable Clip
Cables
Step 9. Final Adjustment
Tighten screw with 5mm allen key
Loosen screw with 5mm Allen key
to lock the Display in desired position.
and tilt the Display as desired.
LOOSEN
TIGHTEN
5mm Allen key
Installation Complete
As Display Manufacturers are constantly releasing new monitor models, Atdec does not accept responsibility if the VESA mounting does not comply with the international standards.
Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. Published: 15.05.12 ©
Fix the Display in position using the
Mount Head Screw and Nylon
Washer supplied (see hardware).
5mm
+/-5°
Allen Key
Adjustment
TIGHTEN
FIRMLY
Nylon
Washer
TIP: Leave slack in the
cables to allow full
movement at the joints.
Cable Covers
TIP: The 5mm and 6mm
Allen Keys can be stored
in the Mounting Rail End
Tilt Down
Caps.
Tilt Up
(
required)
Component Checklist
Mount
Head Screw
Articulated Arm
TOOLS REQUIRED:
• Power Drill
• Phillips Head Screwdriver
• Flat Blade Screwdriver
• Spirit Level
• 7mm (
9
/
") Drill Bit
32
• 12mm (½") Masonry Drill Bit
• 16mm (
5
/
") Socket Wrench or Shifter
8
IMPORTANT INFORMATION
! IMPORTANT - Install Wall Mount as per Installation Instructions.
! Wall Mount has a universal mounting hole pattern that suits a broad range of TVs:
from150 to 805mm wide (6" to 31¾") and 140mm to 500mm high (5½" to 19¾").
! Maximum Load: 65kg (143lbs)
! The Manufacturer accepts no responsibility for incorrect installation.
Step 1. Check Components
Check you have received all parts against the Component Checklist and Hardware above.
Step 2. Locate Drilling Position
Choose the location of your Wall Mount, ensuring that the wall is structurally sound (for a timber stud wall,
locate the stud using a stud detection device). Use the Drilling Guide to mark out the hole centres.
Top
Drilling Guide
FRONT
End Cap
Dust Collector
Un-fold the Drilling Guide and
open the Dust Collector.
Installation Instructions
Flat Screen Wall Mount | Full Motion
Mounting Rail
Hardware
M10 Coach
Screw (x3)
Mounting
Bracket (x2)
M5 Washer
M6 Washer
(x4)
Drilling Guide
M10 Washer
M4/5 Spacer
(x3)
Bush (x4)
Mounting Screws
Drilling Guide
BACK
Double-sided
tape (x2)
Peel away the backing from the
double-sided adhesive tape.
TH-3270-UFM
Concrete
5mm/6mm
Anchor (x3)
Allen Key
M8 Washer
Mount Head
(x4)
(x4)
Screw
M6/8 Spacer
Nylon
Bush (x4)
Washer
M8x30mm / M8x50mm (x4 each)
M6x30mm / M6x45mm (x4 each)
M5x30mm / M5x45mm (x4 each)
WALL
Position the Drilling Guide vertically
onto the wall using a spirit level.
Need help?
Do you have a question about the TH-3270-UFM and is the answer not in the manual?
Questions and answers