Temporary Or Short-Term Shut-Down; Preparing For Extended Periods Of Shut-Down; Cleaning; Maintenance - Riello Condexa PRO NA 75P Installation, Operation And Service Manual

Hide thumbs Also See for Condexa PRO NA 75P:
Table of Contents

Advertisement

SYSTEM MANAGER
SYSTEM MANAGER

7.2 Temporary or short-term shut-down

In the event of a temporary or short-term shut-down (e.g. due to
holidays), proceed as follows:
− Press the MENU button and select "Time Schedule" with the
▲ / ▼ buttons, confirm with ● button.
− Select "Holiday Schedule" with the ▲ / ▼ buttons, and
confirm with the ● button.
Clock Program
"
"
Program Group
"
"
Burn hours till service
"
Reset Service Reminder
"
Holiday Settings
"
"
− Select "Mode" with the ▲ / ▼ buttons, and confirm with ●
button. Select "System" mode and confirm.
Holiday Settings
"
"
Mode
"
"
Holiday Setpoint
"
"
Begin Date
"
"
End Date
"
"
− Select "Holiday Setpoint" with the ▲ / ▼ buttons, and con-
firm with ● button.
− Select "Antifreeze" holiday setpoint and confirm.
Holiday Settings
"
"
Mode
"
"
Holiday Setpoint
"
"
Begin Date
"
"
End Date
"
"

7.3 Preparing for extended periods of shut-down

The following operations shall be necessary if the Condexa PRO NA
modular system is not used for a long period of time:
− turn the main switch of the thermal modules and the main
system switch to "off"
"
"
System
"
"
Comfort
"
"
Saturday
01-08-2015
"
"
Saturday
01-08-2015
"
"
System
"
"
Anti Fr
"
"
Saturday
01-08-2015
"
"
Saturday
01-08-2015
"
"
− Close the fuel and water valves for the heating and domes-
tic hot water system.
9
WARNING: Empty the central heating and domestic system if
there is a danger of freezing.

7.4 Cleaning

Use a cloth dampened in soapy water to clean the boiler's exter-
nal casing.
To remove stubborn marks, use a cloth dampened in a 50% mix
of water and denatured alcohol or a suitable cleaning product.
Carefully dry after cleaning.
0
CAUTION: Do not use abrasive cleaning pads or powder deter-
gents.
0
WARNING: Never clean the boiler without first disconnecting
it from the main power supply by turning the main power
switch and the control panel switch to OFF .
9
The combustion chamber and flue pipes must be cleaned pe-
riodically by a qualified service agency or gas supplier. Ensure
venting is properly sealed and put back together per the in-
structions in this manual, the venting manufacturer instruc-
tions and the local code having jurisdiction. Failure to do so
may result in substantial property damage, severe injury or
death due to carbon monoxide poisoning.

7.5 Maintenance

Please remember that THE PERSON RESPONSIBLE FOR SYSTEM MAN-
AGEMENT MUST ENSURE THAT A PROFESSIONALLY QUALIFIED SERVICE
AGENCY OR GAS SUPPLIER UNDERTAKE PERIODIC MAINTENANCE AND
COMBUSTION EFFICIENCY MEASUREMENTS.
More information on Annual Maintenance can be obtained at
www.egproductsolutions.com or by contacting Evergreen Prod-
ucts International at 1(844)387-4663.
WARNING: Regular maintenance is essential for the safety, effi-
ciency and durability of the boiler.
Servicing is a legal requirement and must be performed at least
once a year by a professionally qualified service agency or gas
supplier.
100

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Condexa pro na 117pCondexa pro series2014259420142595

Table of Contents