STIEBEL ELTRON HSBC 200 Operation And Installation page 8

Integral cylinder
Hide thumbs Also See for HSBC 200:
Table of Contents

Advertisement

INSTALLATIoN
Preparations
f Release the 4 screws on the tabs at the front of the appliance.
f
f Pull the upper section of the appliance towards the front.
f
1 Recessed grip
f Tip the upper section of the appliance backwards. For a
f
better hold during transport, use the recessed grips on the
underside and rear of the appliance.
36
| HSBC
f Place the upper section of the appliance on a base to prevent
f
damage.
Joining appliance sections
Rejoin the appliance sections in reverse order.
The positioning aids and the dotted line marking provide assis-
tance when positioning and inserting the upper appliance section
into the guide groove on the lower section:
1
1 Recessed grip
2 Guide pin
3 Dotted line (perforation in the panel)
4 Guide groove
5 Positioning aid
1
2
3
4
5
www.stiebel-eltron.com

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hsbc 200 s

Table of Contents