Maintenance And Inspection; Daily Inspection; Periodic Inspection; Periodic Parts Replacement - Sanyo Denki Sanups ASE-H series Instruction Manual

Uninterruptible power supply unit. ups power distribution unit. 100v type
Hide thumbs Also See for Sanups ASE-H series:
Table of Contents

Advertisement

11. Maintenance and Inspection

◆ 11.1 Daily Inspection
Observe the control panel LEDs to confirm that no abnormality is indicated.
No other particular inspection or maintenance is required.
◆ 11.2 Periodic Inspection
The following items should be inspected every six months.
CAUTION
(1) External Visual Inspection
Damage can occur if dust accumulates on internal components, so remove any dust
or grime from the intake and exhaust vents.
◆ 11.3 Periodic Parts Replacement
The intended system service life is seven years. Parts that should be periodically
replaced during the service life are as follows:
(1) Batteries
Internal maintenance and inspection should be performed only by
technically qualified personnel. Electric shock, injury, burning,
smoke or file could otherwise result.
Perform inspection only after the input power has been turned off
and the UPS has completely stopped. Electric shock hazards may be
present.
As electrical parts remain charged as long as the batteries are
connected, never touch them. Electric shock hazards may be present.
Once every 4.5 years
- 27 -

Advertisement

Table of Contents
loading

Table of Contents