Instructions for Special Edition Kit #JM-44
□
5.Draw shingle guidelines on the Front Roof, Rear Roof, and Eave.
Draw the first guideline 1
(away from the bevel) and the rest of the guidelines spaced 1" apart.
1
1
1
1
1
/
4
1
/
" (one shingle length) above the bottom edge
4
The bevels face the inside,
the guidelines go on the outside
1
1
1
1
1
1
1
1
/
1
1
/
4
4
The face of the bevel is straight up-and-down
Let the glue dry.
Assembly Instructions page 9
1
1
1
1
1
1
/
"
4