How To Install The Outdoor Unit; Drainage Work; Routing The Tubing And Wiring - Sanyo Mini ECO-i 85464359981002 Installation Instructions Manual

Sanyo air conditioner installation instructions
Table of Contents

Advertisement

4. HOW TO INSTALL THE OUTDOOR UNIT

4-1. Installing the Outdoor Unit
G
Use concrete or a similar material to create the base, and
ensure good drainage.
G
Ordinarily, ensure a base height of 2 in. or more. If a drain
pipe is used, or for use in cold-weather regions, ensure a
height of 6 in. or more at the feet on both sides of the unit.
(In this case, leave clearance below the unit for the drain
pipe, and to prevent freezing of drainage water in
cold-weather regions.)
G
Refer to the Fig. 4-1 for the anchor bolt dimensions.
G
Be sure to anchor the feet with the anchor bolts (M10 or
3/8"). In addition, use anchoring washers on the top side.
(Use large square 1-1/4" × 1-1/4" SUS washers with
diameters of 3/8".) (Field supply)

4-2. Drainage Work

Follow the procedure below to ensure adequate draining for
the outdoor unit.
G
For the drain port dimensions, refer to the figure at right.
G
Ensure a base height of 6 in. or more at the feet on both
sides of the unit.

4-3. Routing the Tubing and Wiring

G
The tubing and wiring can be extended out in 4 directions:
front, rear, right, and down.
G
The service valves are housed inside the unit. To access
them, remove the inspection panel. (To remove the
inspection panel, remove the 3 screws, then slide the
panel downward and pull it toward you.)
(1) If the routing direction is through the front, rear, or right,
use a nipper or similar tool to cut out the knockout holes for
the inter-unit control wiring outlet, power wiring outlet, and
tubing outlet from the appropriate covers A and B.
(2) If the routing direction is down, use a nipper or similar tool to
cut out the lower flange from cover A.
G
CAUTION
G
Route the tubing so that it does
not contact the compressor,
panel, or other parts inside the
unit. Increased noise will result if
the tubing contacts these parts.
When routing the tubing, use a
tube bender to bend the tubes.
Drain port (2 locations)
6-47/64
8-5/8
33/64
33/64
Drain port
Inter-unit control wiring
Inspection panel
Cover A
Front
Power supply
56
25-63/64
4-3/8
5-29/32
33/64
33/64
37
Anchor bolt (M10 or 3/8")
Fig. 4-1
Rear
Cover B
Right
Down
Tubing outlet
Fig. 4-2
Unit: in.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents