ShineMaster User Manual

Advertisement

Table of Contents
loading

Summary of Contents for Growatt ShineMaster

  • Page 1 SHENZHEN GROWATT NEW ENERGY TECHNOLOGY CO.,LTD No.28 Guangming Road, Shiyan Street, Bao’an District, Shenzhen, P.R.China ShineMaster User Manual 86 755 2747 1942 + 86 755 2747 2131 service@ginverter.com www.ginverter.com...
  • Page 2: Table Of Contents

    3.2 ShineMaster installation method 3.3 Connect to the photovoltaic device ShineMaster built-in page parameter setting 4.1 ShineMaster IP address query 4.2 ShineMaster built-in page access 4.3 ShineMaster Status View 4.4 ShineMaster Datalogger managing 4.5 Baud Rate Setting 4.6 Ser ver Address and Shine Master...
  • Page 3: About The User Manual

    1.2 Copyright statement Device Maintenance This user manual is copyrighted by Growatt. Any unit or individual may not excerpt or copy part or all of this user's manual without the written permission of the company. It Common faults and troubleshooting may not be transmitted in any form, including materials and publications.
  • Page 4: Product Description

    Table 2-1 2.1.2 Indicator Led Fig.2-1 ShineMaster is equipped with seven LED indicators. The status of the ShineMaster can be 2.1.1 Interface displayed by the LED indicator. As shown in figure 2-1 and table 2-2 above. The interface of ShineMaster, as shown in figure 2-1 above.
  • Page 5: Unpacking

    1 pcs 2.2 Unpacking Terminal RS485 1 pcs Wall plastic column 4 pcs 2.2.1 Packing List M3.5*20 screw 4 pcs ShineMaster user manual 1 pcs ShineMaster and accessories can be found as below figure 2-2: Ethernet cable 1 pcs Table 2-4...
  • Page 6: Shinemaster Network Introduction

    10 digits mixed up with letters and numbers. the serial No. and check code for each device are unique, to identify each ShineMaster. When you want to upload the data of ShineMaster to the server, you need the serial No. and ‘check code’ corresponding to register on the server 2.3 ShineMaster Network Introduction...
  • Page 7: Shinemaster Installation

    485A+ on the RS485 port of the slave device corresponds to A1+ or A2+ on the ShineMaster 485 port, 485B- and ShineMaster 485 on the RS485 port of the slave device. Corresponding to B1- or B2-. The following is a schematic diagram of the connection...
  • Page 8: Shinemaster Ip Address Query

    ShineMaster IP address with the serial number of the ShineMaster as the device name. This IP address is the IP address assigned by the router to the ShineMaster. If you do not know how to do this, contact your network administrator to perform the operation.
  • Page 9: Shinemaster Status View

    4.4.1 Add device 4.3 ShineMaster Status View Click the ShineMaster datalogger Status to view information such as the “System Status (1) Before ShineMaster monitors photovoltaic equipment, it is necessary to enter the Information”, “Serial Number”, “Server Address”, “Number of Connected Devices”, “ShineMaster Data Collector Settings”...
  • Page 10 (4) Select "Add" and click Save. (5) After successfully saving, enter the "Device Status" page to confirm whether the device is added successfully. 4.4.2 Remove device (3) In the third drop-down list, fill in the communication address of monitored device (1) Select the monitoring method for monitoring PV devices in the first drop-down list of "Add or Remove Devices".
  • Page 11: Baud Rate Setting

    Add and delete device: (1) ShineMaster’s Default setting of the DHCP function is “ON” it will automatically get IP address.ShineMaster When you need delete a device, all the options should be the same with the momemet you add this device like: 485 channel, device type, address, if you are not sure about this you can check the device status first.
  • Page 12 Shinemaster added to the server, if the subsequent need to modify some parameters of The datalogger or enable, disable a function can be done through the server.
  • Page 13 (1) After the registration is completed, it will automatically jump to the ShineServer main Note: “ShineMaster serial number” and “datalogger check code” seen on the package interface. Click "plant" → "plant data" , and the displayed information is the total power box.
  • Page 14 (1) In the Server page click the “Device Management” and then click “Data Logger”. In this page click set the device updating icon. (2) Add one device, add one Growatt inverter set the 485 communication address is 1. Fig 5-3 (2) Click "plant"...
  • Page 15 (4) Above adding or deleting devices if success following figure will pop out. (3) If success following figure will pop out. 5.3.2 Change ShineMaster Baud rate. Note: The second channel of Baud rate setting would be the same as the fist channel.
  • Page 16 1. Avoid frequent switching of power supply, gently handle, to prevent damage; 2. ShineMaster is a product for indoor use. Do not place ShineMaster in a humid If you press the “reset” button for five seconds, it will erase all the registered device environment or in direct sunlight.
  • Page 17 RS485 communication distance cable) Contact us Growatt New Energy provides customers with a full range of technical support. Users can contact the nearest Growatt new energy office or customer service point, or they can contact the company's customer service center directly.