Mechanical Installation; Installer Responsibilities; Receiving Inspection; Service Clearance - Daikin MPS015 F Installation And Maintenance Manual

Maverick ii series heating and cooling r-410a refrigerant commercial packaged rooftop systems with energy recovery wheel and microtech iii unit controller
Table of Contents

Advertisement

Installer Responsibilities

The installation of this equipment shall be in accordance
with the regulations of authorities having jurisdiction and all
applicable codes. It is the responsibility of the installer to
determine and follow the applicable codes.
Sharp edges on sheet metal and fasteners can cause
personal injury. This equipment must be installed, operated,
and serviced only by an experienced installation company and
fully trained personnel.
Figure 1: Service Clearances
Optional
Energy Recovery Wheel (ERW)
Assembly
60.00
(1524 mm)
Optional
Energy Recovery Wheel
Exhaust Air Fan Assembly
IM 1058-8 • MAVERICK II ROOFTOP SYSTEMS
CAUTION
Evaporator/
Hot Gas Reheat Coil
B
60.00
(1524 mm)

Receiving Inspection

When the equipment is received, all items should be carefully
checked against the bill of lading to be sure all crates and
cartons have been received. If the unit has become dirty
during shipment (winter road chemicals are of particular
concern), clean it when received .
All units should be carefully inspected for damage when
received. Report all shipping damage to the carrier and file a
claim. In most cases, equipment is shipped F.O.B. factory and
claims for freight damage should be filed by the consignee.
Before unloading the unit, check the unit nameplate to make
sure the voltage complies with the power supply available.

Service Clearance

Allow service clearances as approximately indicated in
1. Also, Daikin recommends providing a roof walkway to the
rooftop unit as well as along each side of the unit that provides
access to most controls and serviceable components.
Fan
Assembly
(removal from
this side only)
15-50 Ton
Optional Hot
Water Heat
(removal from
this side only*)
Optional Gas Furnace
or Electric Heat
96.00
(2438 mm)
A = 72 (1828 mm)
B = 60 (1524 mm)
4
m
I
eChanICal
nsTallaTIon
* 61-75 Ton
Fan and Gas/Electric/Hot Water
Heaters can be removed from
either side
A
15-50 Ton
61-75 Ton
60 (1524 mm)
72 (1828 mm)
www.DaikinApplied.com
m
I
eChanICal
nsTallaTIon
Figure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents