Figure 27: Capacity of Pipe Natural Gas (CFH)
Pipe Length
(ft)
½
10
132
20
92
30
73
40
63
50
56
60
50
70
46
80
53
90
40
100
38
125
34
150
31
175
28
200
26
NOTE: Use multiplier below for other gravities and pressure drops.
Table 17: Specific Gravity Other Than 0.60
Specific Gravity
0 .50
0 .60
0 .70
0 .80
0 .90
1 .00
Propane-Air
1 .10
1 .55
2 .00
Table 18: Pressure Drop Other Than 0.3"
Pressure Drop
Multiplier
0 .1
0 .577
0 .2
0 .815
0 .3
1 .000
0 .4
1 .16
0 .6
1 .42
0 .8
1 .64
IM 1058-8 • MAVERICK II ROOFTOP SYSTEMS
With Pressure Drop of 0.3" W.C. & Specific Gravity of 0.60
¾
1
278
520
190
350
152
285
130
245
115
215
105
195
96
180
90
170
84
160
79
150
72
130
64
120
59
110
55
100
Multiplier
1 .100
1 .000
0 .936
0 .867
0 .816
0 .775
0 .740
Propane
0 .622
Butane
0 .547
Pressure
Multiplier
1 .0
1 .83
2 .0
2 .58
3 .0
3 .16
4 .0
3 .65
6 .0
4 .47
8 .0
5 .15
Pipe Size-inches (Ips)
1050
1600
2050
730
1100
2100
590
890
1650
500
760
1450
440
670
1270
400
610
1150
370
560
1050
350
530
990
320
490
930
305
460
870
275
410
780
250
380
710
225
350
650
210
320
610
Sequence of Operation (Staged Control)
Low Heat Option (2 Stage Control)
The following details the sequence of operation for the low
heat option.
1 . Unit DDC control calls for heat.
2 . Furnace DDC control module receives a call for heat.
3 . High limit switch is checked for safe condition.
4 . Proof of airflow switch is check for combustion airflow.
5 . 60 second prepurge cycle starts.
6 . Spark ignitor is activated for 3 seconds.
7 . Gas valve receives a command for stage 1 of heat.
8 . Burner is ignited.
9 . Unit DDC controller calls for stage 2 of heat.
10 . Furnace DDC controller receives a stage 2 heat command.
11 . Gas valve receives a command for stage 2 of heat.
High Heat Option (4 Stage Control)
For a unit with the optional high heat the above sequence is
followed for the first two stages.
For the remaining 2 stages the above procedure is repeated on
the second furnace module.
30
o
PTIonal
2
3
4800
8500
3300
5900
2700
4700
2300
4100
2000
3600
1850
3250
1700
3000
1600
2800
1500
2600
1400
2500
1250
2200
1130
2000
1050
1850
980
1700
www.DaikinApplied.com
G
h
as
eaT
4
17500
12000
9700
8300
7400
6800
6200
5800
5400
5100
4500
4100
3800
3500

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents