Installer Responsibilities

Sharp edges on sheet metal and fasteners can cause
personal injury. This equipment must be installed,
operated,
and
serviced
installation company and fully trained personnel.
The installation of this equipment shall be in accordance
with the regulations of authorities having jurisdiction and all
applicable codes. It is the responsibility of the installer to
determine and follow the applicable codes.

Receiving Inspection

When the equipment is received, all items should be carefully
checked against the bill of lading to be sure all crates and
cartons have been received. If the unit has become dirty
during shipment (winter road chemicals are of particular
concern), clean it when received .
All units should be carefully inspected for damage when
received. Report all shipping damage to the carrier and file a
claim. In most cases, equipment is shipped F.O.B. factory and
claims for freight damage should be filed by the consignee.
Before unloading the unit, check the unit nameplate to make
sure the voltage complies with the power supply available.
IM 1125-7 • REBEL ROOFTOPS
CAUTION
only
by
an
experienced

Service Clearance

Location . Care should be taken for the installation
location to minimize snow drifts on the outdoor coil.
Allow service clearances as approximately indicated in
1. Also, Daikin recommends providing a roof walkway to the
rooftop unit as well as along each side of the unit that provides
access to most controls and serviceable components.
Refer to NEC and local for minimum clearances around the
unit and control panel.

Ventilation Clearance

Below are minimum ventilation clearance recommendations.
The system designer must consider each application and
provide adequate ventilation. If this is not done, the unit may
not perform properly.
Unit(s) Surrounded by a Screen or a Fence:
1 . The bottom of the screen or fence should be at least 1 ft.
(305 mm) above the roof surface.
2 . The distance between the unit and a screen or fence
should be as described in
3 . The distance between any two units within a screen or
fence should be at least 120" (3048 mm).
Unit(s) Surrounded by Solid Walls:
1 . If there are walls on one or two adjacent sides of the unit,
the walls may be any height. If there are walls on more
than two adjacent sides of the unit, the walls should not
be higher than the unit.
2 . The distance between the unit and the wall should be at
least 96" (2438 mm) on all sides of the unit.
3 . The distance between any two units within the walls
should be at least 120" (3048 mm).
Do not locate outside air intakes near sources of contaminated air.
If the unit is installed where windy conditions are common,
install wind screens around the unit, maintaining the
clearances specified (see
Figure
important to maintain adequate head pressure control when
mechanical cooling is required at low outdoor air temperatures.
4
M
I
eChanICal
nsTallaTIon
CAUTION
Figure
Figure
1 .
1). This is particularly
www.DaikinApplied.com
M
I
eChanICal
nsTallaTIon

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents