Rigging and Handling

Only trained and qualified personnel should be allowed to rig
loads or operate load rated cranes and/or hoist assemblies.
Do not use a forklift to lift or maneuver the unit. Failure to use
a load rated crane or hoist assembly to lift or maneuver the
unit can cause severe personal injury and property damage.
Use all lifting points. Improper lifting can cause property
damage, severe pers al injury, or death.
Lifting points may not be symmetrical to the center of gravity
of the unit. Ballast or unequal cable lengths may be required.
Rigging holes for shackles are integral on the unit base. All
six lifting points must be used for rigging the equipment .
Use four independent lines, securing one end of a line
to a unit base lifting point and the other end of the line
to an associated spreader bar lifting point (see
and
Figure
11).
Figure 9
is an example of an instruction label
shipped with each unit.
Figure 9: Rigging Label
LIFT UNIT ONLY AS SHOWN
MUST USE ALL OF THESE
LIFTING LUGS FOR LIFTING UNIT.
www.DaikinApplied.com
WARNING
WARNING
CAUTION
Figure 10
SPREADER BARS REQUIRED
Use spreader bars, 96" to 100" (2438 to 2540 mm) wide to
prevent damage to the unit cabinet. Avoid twisting or uneven
lifting of the unit. The cable length from the bracket to the hook
should always be longer than the distance between the outer
lifting points.
If the unit is stored at the construction site for an intermediate
period, take these additional precautions:
1 . Support the unit well along the length of the base rail.
2 . Level the unit (no twists or uneven ground surface).
3 . Provide proper drainage around the unit to prevent
flooding of the equipment.
4 . Provide adequate protection from vandalism, mechanical
contact, etc.
5 . Securely close the doors.
6 . Cover the supply and return air openings.
Table 4
and
Table 5
lists the weight distribution at each of the
lifting points on the unit (refer to
6
details lifting point locations.
weights of unit curbs and other sections of the unit.
Table 2: Unit Base Weights
Unit (Tons)
015
017
020
026
030
035
040
050
Table 3: Unit Curb Weights
Unit (tons)
015–035
040–050
015–035
040–050
13
IM 1058-8 • MAVERICK II ROOFTOP SYSTEMS
m
I
eChanICal
Figure 10
and
Figure
Table 7
through
Table 12
Total Weight (lbs)
2655
2705
3610
3610
3610
3660
4685
4985
Curb Height (inches)
Total Weight (lbs)
Standard Unit
14
24
14
24
Unit with Energy Wheel
14
24
14
24
nsTallaTIon
11).
Table
lists the
341
504
461
706
458
674
619
908

Hide quick links: