Operation - Lincoln Electric Infinity-Pak K3926-1 Operator's Manual

Station
Table of Contents

Advertisement

INFINITY-PAK STATION

OPERATION

Join the end wire from box 1 with the
start wire from box 2 using the Butt
Welder (recommended accessory).
Follow butt welding instructions on
page B-2.
Remove the burr in the wire joint
using the Wire Sizer*
(recommended accessory for
the docking station).
* Alternatively, you may remove the burr in the wire using a rotary tool with a stone bit.
Wire Clamp If using
with wire over .052
(1.3mm), disassemble
and flip the clamping
block around to the
textured side for
better gripping.
Box 1
Start Wire
End Wire
Adjust wire bridge
so it is in the proper
position (see page
A-2). Push in
spring clamp on the
wire bridge and
insert wire along
the groove
between the two
boxes. Release
spring clamp to
hold wire in place.
B-1
BOX
SETUP
Empty Wire Alert Flag The empty
wire flag installs just above the
transfer arm on the center post. It
should be set in the downward
position toward the current active
box of wire. When the box is
finished, the arm will transfer and flip
the flag upward.
OPERATION
Box 2
Start Wire
When wire from box 1
runs out, the transfer
arm will switch over to
box 2. Simply replace
empty box and repeat
steps 1-3. Flip the wire
bridge when changing
boxes so the spring
clamp side is always
opposite the side of the
active box.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Infinity-pak k3927-1Infinity-pak k4106-1

Table of Contents