Lowara e-SVE Installation, Operation And Maintenance Manual page 40

Smart pump range
Table of Contents

Advertisement

en – Original instructions
Calculation of Effective Required Value in Cascade Serial (MSE):
K = number of active pumps
Pr = pump priority
P02 (Actual Required Value) = P01 (Required Value) + (K – 1) * P58 (Actual Value Increase) –
(Pr – 1) * P59 (Actual Value Decrease)
Calculation of Effective Required Value in Cascade Synchronous (MSY):
K = number of active pumps (K ≥ Pr)
P02 (Actual Required Value) = P01 (Required Value) + (K – 1) * (P58 – P59)
Behaviour of P58 (Actual Value Increase) and P59 (Actual Value Decrease):
 if P58 (Actual Value Increase) = P59 (Actual Value Decrease) → Pressure constant,
 if P58 (Actual Value Increase) > P59 (Actual Value Decrease) → Pressure rises when assist
 if P58 (Actual Value Increase) < P59 (Actual Value Decrease) → Pressure decreases when
40
independent of how many pumps are in operation.
pump switches on.
assist pump switches on.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

VmeE-hme

Table of Contents