8 - ASSEMBLY OF BOILER AESTHETICS UNIT
i) hydraulic connection between tank and water mains (supply-return-sanitary-filling)
(RESPONSIBILITY OF SPECIALISED HYDRAULIC TECHNICIAN)
l) hydraulic supply to boiler and checking for leaks
k) assembly of aesthetics unit of boiler
After completing steps "i" and "l", assemble the aesthetics unit of the boiler.
2
4
For convenience, the panels are identified with the numbers in the picture.
60
60
(RESPONSIBILITY OF SPECIALISED HYDRAULIC TECHNICIAN).
5
3
BOILER AESTHETICS UNIT
7
1
6