Glass Positioning - Hussmann SMG8B Installation & Operation Manual

Medium temperature self contained
Table of Contents

Advertisement

P/N 3018126_E

GLASS POSITIONING

Check the following to improve opening or
closing of the merchandiser front glass.
1. Has the merchandiser been leveled
according to preceding paragraphs?
2. Is the glass handle installed correctly?
Verify the glass is bottomed out the length
of the handle. A bowed handle indicates the
glass may not be bottomed out at the center
of the handle.
The handle must be removed before it can be
repositioned. The handle is held in place with
silicone which must be completely removed
from the handle and the glass. Remove the
handle by pulling it away from the glass (do
not use tools to pry this loose). A damaged
or bent handle must be replaced. Apply new
silicone into the handle and firmly press onto
the glass.
3. Is the glass seated in the clamp hardware
correctly?
Verify glass is bottomed out in clamp
hardware. If the glass is not bottomed out in
the clamp hardware it can be re-positioned as
follows:
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
GLASS MUST
BE BOTTOMED OUT
IN HANDLE
GLASS MUST
BE BOTTOMED OUT IN
CLAMP HARDWARE
A. Remove the glass and clamp hardware
from the merchandiser by opening the
glass and loosening set screws in hinge
(Metric 3 millimeter set screws).
B. Slide the glass and clamp hardware to the
side out of the hinges and lay them on an
appropriate work surface.
Note: Adjacent glass must be closed.
C. Loosen the 8 set screws on the underside
of the clamp hardware.
D. Push the clamp hardware onto the glass
until bottomed out.
E. The clamp hardware must overhang the
glass by an equal amount on each side.
F. Tighten set-screws and re-install on
merchandiser. Apply a drop of Loctite
242 or equivalent thread locking fluid onto
each set screw of the glass clamp assembly.
Tighten all screws with a TORX T15 bit and
re-install onto merchandiser.
IMPORTANT: Tighten all glass clamp set screws
to 26 inch lbs. Verify bit is in good condition and
not worn out. When set screws are tightened, glass
is firmly held in place by glass clamps.
HINGE
OPEN GLASS AND LOOSEN 2 SET SCREWS TO
ALLOW GLASS AND CLAMP HARDWARE TO SLIDE
(1 SET SCREW AT EACH HINGE)
1-5
HINGE
SMG8B & SSG8B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ssg8b

Table of Contents