2.10 System purging

If explosive gases are to be used, purge the process with inert dry gas like Nitrogen, Argon etc. for at
least 30 minutes. Complete purging is also required to remove such gases from the system before
exposing the system to air.

2.11 Seals

The seals fitted are compatible with the published list of gases, at the stated conditions.

2.12 Equipment storage

The equipment should be stored in its original packing in a cupboard, warehouse or similar. Care should
be taken to not subject the equipment to excessive temperatures or humidity.

2.13 Electromagnetic compatibility

The MASS-VIEW® series carries the CE-mark.
Therefore it has to comply with the EMC requirements as are valid for these instruments.
However compliance with the EMC requirements is not possible without the use of proper cables and
connector assemblies. Do not use unshielded wire terminals.
9.17.051
BRONKHORST®
MASS-VIEW® series
Page 13

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MASS-VIEW series and is the answer not in the manual?

Table of Contents