Lcd Description; Power Flow - Eaton EATS16N Installation And User Manual

Hide thumbs Also See for EATS16N:
Table of Contents

Advertisement

2.4

LCD description

1

Power flow

1
Measures/Infos
2
2.4.1 Power flow
EATS16_EN
ATS Settings
3
Events
4
or
or
or
or
or
or
S1 is defined as the priority source (true by default)
or
S2 is defined as the priority source (can be set)
S1 not powered
or
S2 not powered
S1 powering the load
or
S2 powering the load
S1 powered but not powering the load
or
S2 powered but not powering the load
Transfer from S1 to S2
or
Transfer from S2 to S1
Transfer from S1 to S2 for Test
or
Transfer from S2 to S1 for Test
2. Presentation
4
3
2
Page 5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eats16

Table of Contents