Site Preparation

Check the national and local building codes BEFORE installation.
Conduit and Concrete Pad
Trench and install conduit. Before trenching, contact underground
utility locating companies. Conduit must be UL approved for low
and high voltage. Consider the operator placement BEFORE
installing the pad or post.
Gate
Gate must be constructed and installed according to ASTM F2200
standards (refer to page 4). Gate must fit specifications of operator
(refer to specifications).
INTRODUCTION
Safety
Entrapment protection devices are required to protect against any entrapment or
safety conditions encountered in your gate application. Install a warning sign
(two provided) on the inside and outside of the property, where easily visible.
Additional Accessories
The vehicle loops allow the gate to stay open when vehicles are obstructing the
gate path. Suggested for vehicles 14 feet (4.27 m) or longer. Vehicle loops are
not required but are recommended. Before installing your Access Control
Device(s) be sure to complete a site survey and determine the best device for
your site needs.
8