Commissioning - Siemens SIMATIC HMI OP3 Equipment Manual

Operator panel
Table of Contents

Advertisement

Commissioning

Diagrammatic
Figure 14-1 shows the most important commissioning steps for initial startup,
representation
restarting and normal operation of the OP3. This is followed by an
explanation of the different steps for taking the OP3 into service.
Initial startup and restart
The OP3 should operate with a
new/modified configuration
Turn on the OP3's power supply
Set transfer mode using standard screen
System
OPMode
Transfer configuration data to OP3
ProTool
Figure 14-1 Commissioning
Operator Panel OP3
Edition 11/99
Transfer
OP3
Message level
14
Normal operation
The OP3 is operated with an
unmodified configuration
14-1