Electrical Hookup; Power Switch - Bunn Sure Immersion 312 Installation & Operating Manual

Bean-to-cup single serve brewer
Hide thumbs Also See for Sure Immersion 312:
Table of Contents

Advertisement

INITIAL SET-UP
- FOR INDOOR USE ONLY -
Electrical Hook-Up
CAUTION
Improper electrical installation will damage electronic
components.
1. An electrician must provide electrical service
as specified.
2. Using a voltmeter, check the voltage and color
coding of each conductor at the electrical source.
3. Connect the dispenser to the power source
(plug it in).
4. Locate the switch at the rear of the machine and
flip the power switch to the "ON" position
NOTE:
The boot-up sequence may take 60-90
seconds, and the machine will cycle in preparation
for operation. The door must be closed, or the door
interlock engaged at power up.
5. If plumbing has been hooked up, the dispenser
will auto-fill and heat
6. After the boot-up sequence is complete, open
the door and remove the cardboard shipping pad
from the top of the brew box.
120 Volt AC Models
NOTE:
This electrical service consists of 2 current
carrying conductors (L1 and Neutral) and a separate
conductor for chassis ground.
Cardboard Shipping Pad before boot-up
Cardboard Shipping Pad after boot-up
(remove after boot-up)
6
Plug for
120V Models

POWER SWITCH

LOCATION
(back of machine)
053118

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents