Figure 3.10 Plim Board - Samsung OfficeServ 7100 Installation Manual

Samsung batter installation manual
Hide thumbs Also See for OfficeServ 7100:
Table of Contents

Advertisement

CHAPTER 3. Ошибка! Стиль не определен.
3.3.1.5 PLIM Board
The OfficeServ 7100 system does not support the power to the PLM board. Therefore, the
PLIM board does not support PoE and only performs the same function as that of the LIM
board.
When the PLIM board is used, the board should be mounted after removing Shunt pin J1,
J2 and J3 supplying the PoE Power.
3-10
1
1
1
J3
J2
J1

Figure 3.10 PLIM Board

© SAMSUNG Electronics Co., Ltd.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents