Installation; Unpacking And Inspection; Preparation; Mounting The Unit - MPP Solar 3KW User Manual

Pip-mk series inverter / charger
Table of Contents

Advertisement

INSTALLATION

Unpacking and Inspection

Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should
have received the following items inside of package:
 The unit x 1
 User manual x 1
 Communication cable x 1
 Software CD x 1

Preparation

Before connecting all wirings, please take off bottom cover by removing two screws as shown below.

Mounting the Unit

Consider the following points before selecting where to install:
Do not mount the inverter on flammable construction materials.
Mount on a solid surface
Install this inverter at eye level in order to allow the LCD display
to be read at all times.
The ambient temperature should be between 0°C and 55°C to
ensure optimal operation.
The recommended installation position is to be adhered to the
wall vertically.
Be sure to keep other objects and surfaces as shown in the
right diagram to guarantee sufficient heat dissipation and to
have enough space for removing wires.
SUITABLE FOR MOUNTING ON CONCRETE OR
OTHER NON-COMBUSTIBLE SURFACE ONLY.
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5kw

Table of Contents