Lcd Setting - MPP Solar 3KW User Manual

Pip-mk series inverter / charger
Table of Contents

Advertisement

LCD Setting

After pressing and holding "
button to select setting programs. And then, press "
exit.
Setting Programs:
Progra
Description
m
00
Exit setting mode
Output source priority:
01
To configure load power
source priority
"
button for 3 seconds, the unit will enter setting mode. Press "
Selectable option
Escape
USB : Utility first (default)
SUB: Solar first
SBU priority
14
" button to confirm the selection or "
Utility will provide power to the
loads as first priority.
If Utility energy is unavailable,
solar energy and battery
provides power the loads.
Solar energy provides power to
the loads as first priority.
If solar energy is not sufficient
to power all connected loads,
utility energy will supply power
to the loads at the same time.
Battery provides power to the
loads only when solar and utility
is not sufficient.
Solar energy provides power to
the loads as first priority.
If solar energy is not sufficient
to power all connected loads,
battery energy will supply power
to the loads at the same time.
Utility provides power to the
loads only when battery voltage
drops to either low-level
warning voltage or the setting
point in program 12 or solar and
battery is not sufficient.
" or "
"
" button to

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5kw

Table of Contents