FC 300 Instruction Manual
Mechanical Installation
"
Mechanical Mounting
"
1.
Drill holes in accordance with the measurements given.
You must provide screws suitable for the surface on which you want to mount
2.
the FC 300. Retighten all four screws.
FC 300 IP20 allows side-by-side installation. Because of the need for cooling, there must be a
minimum of 4 in (100 mm) free air passage above and below the FC 300.
The back wall must always be solid.
14
How to Install
MG.33.A6.22 - VLT is a registered Danfoss trademark
Need help?
Do you have a question about the FC 300 and is the answer not in the manual?