Installation Instructions; Prepare For Installation; Check Door Dimensions; Install Strike And Reinforcement Plate Into Door Jamb - Schlage BE489WB Reference Manual

Hide thumbs Also See for BE489WB:
Table of Contents

Advertisement

Check out the Interactive Instructions
For step-by-step, illustrated and video instructions, check out
the interactive instructions at the link below. Use any QR code
reader or type in the address into your web browser on any
internet-connected device.
https://instructions.allegion.
com/instr/65/1110
A

Check door dimensions.

See consumer.schlage.com/Service-Support for door
preparation instructions if dimensions are different. If
crossbore is 1½", follow steps to remove spacer.
Also, check your door alignment. Make sure that the hole for
the bolt in the door edge lines up with the hole for the strike
in your door jamb.
2³⁄₄" (70 mm)
OR
2³⁄₈" (60 mm)
For maximum
1" (25 mm)
security, install
reinforcement plate.
Door Edge
Strike Cut-Out (not to scale)
1¹⁄₂" (38 mm)
1" (25 mm)
Deep
¹⁄₈" (3 mm)
Pilot Hole

Installation Instructions

Door Stop
2¹⁄₈" (53 mm)
Crossbore
Hole
4" (100 mm)
Minimum
Actual Size
Actual Size
1"
(25 mm)
Rotate 180˚
if door stop is
on left side.
2³⁄₄"
(70 mm)
¹⁄₈" (3 mm)
3" (76 mm) Deep
1¹⁄₈"
(29 mm)

Prepare for Installation

Tools Needed
• Phillips screwdriver
• Tape Measure
• Pencil

IMPORTANT NOTES

DO NOT use a power drill for installation!
• Install and test lock with door open to avoid being locked
out.
Only if crossbore is 1½" (Step A), Remove spacer.
Remove screw and remove spacer by rotating from the
outside touchscreen.
Reinstall screw then continue.
B

Install strike and reinforcement plate into door jamb.

Door jamb may need preparation to fit strike reinforcement
plate.
For maximum
security, install
reinforcement plate.
Strike Cut-Out (not to scale)
For Alternate Faceplate
• Wood Block
• Hammer
Door Stop
Actual Size
Actual Size

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF