Step 4
1. Fit a ferrite core to the motor cable, as shown
in the diagram on the right (for Class B filtered
variants only).
2. Connect the power and motor cables to the
Power Module terminals.
3. Ensure the cables are correctly secured by the
screening clamps.
Step 5
1. Push the gland plate against the Power
Module base.
2. Ensure that the cables are pulled through the
cable glands to remove excess cable from
inside the Power Module housing.
3. Screw the gland plate securely into place with
a maximum torque of 2.0 Nm (17.7 lbf.in)
4. Ensure that the seals are correctly in place to
maintain the IP55 rating.
5. Tighten the cable glands to a maximum torque
of 2.5 Nm (22.12 lbf.in).
6. Fit grommets to the gland plate holes that
have no cables.
The grommets are provided in the Accessory Bag
provided with the product.
PM230 Power Module IP55
Hardware Installation Manual, 11/2014, A5E35319202B AA
Connecting
4.6 Wiring Sequence
49