Siemens SINAMICS G120P Hardware Installation Manual page 48

Power module pm230 ip55/ul type 12
Hide thumbs Also See for SINAMICS G120P:
Table of Contents

Advertisement

Connecting
4.6 Wiring Sequence
Wiring sequence
To perform the correct wiring sequence, the following actions must be taken:
Step 1
Prepare the cables according to the dimensions
given in the previous section of this manual.
Step 2
1. Remove the retaining screws from the gland
plate.
2. Remove the gland plate.
Step 3
1. Fit the cable glands to the cables.
2. Ensure that the cable glands are unscrewed
and the cables can move freely through the
cable glands.
An EMC cable gland is required to be fitted to the
motor power cable and the Control Unit cable to
ensure EMC compliance.
48
Hardware Installation Manual, 11/2014, A5E35319202B AA
PM230 Power Module IP55

Advertisement

Table of Contents
loading

Table of Contents