Mounting Of Instrument Panel - Swann AMI Oxytrace Operator's Manual

Hide thumbs Also See for AMI Oxytrace:
Table of Contents

Advertisement

AMI Oxytrace QED
Installation
Turn-on
power
Run-in Period
Calibration
Open
Sample Flow
Programming
3.2.
Mounting re-
quirements
22
Switch on power.
First, the analyzer performs a self test, displays the firmware ver-
sion and then starts normal operation
Leave the sensor at the air. The sensor has to run-in for at least
30 min, better 1 h. During this time it has to be at air with a dry and
clean membrane and has to be connected to the powered instru-
menty. Calibrate the sensor after this time, see
and mount it into the flow cell afterwards.
Open the flow regulating valve to allow sample flow into the flow
cell and into the waste. Sample must always overflow into waste
Program all parameters for external devices (interface, etc.). Set
all parameters for instrument operation (limits, alarms).

Mounting of Instrument Panel

The first part of this chapter describes the preparing and placing of
the system for use.
 The instrument must only be installed by trained personnel.
 Mount the instrument in vertical position.
 For ease of operation mount it so that the display is at eye
level.
 For the installation a kit containing the following installation
material is available:
– 4 Screws 8x60 mm
– 4 Dowels
– 4 Washers 8.4/24 mm
The instrument is only intended for indoor installation.
For dimensions see
14.
Dimensions (Oxytrace and Oxytrace QED), p.
Calibration, p.
47.
A-96.250.531 / 300617