C
ommissioning Via Web UI - Wireless connection
CONNECTION TO THE INVERTER - WIRELESS
Commissioning could be carried out via wireless connection to the in-
verter's Web User Interface. Initial setup of the system must therefore
be carried out via a tablet, notebook or smartphone with a wireless con-
nection.
• Close the DC disconnect switches
voltage from the photovoltaic generator.
Make sure irradiation is stable and adequate for the inverter commissioning procedure to be
completed.
• Once powered, the inverter will automatically create a wireless network
(approx. 60 seconds after its switch-on).
• Enable the wireless connection on the device which is being used
for the board setup (tablet, smartphone or PC) and connect it
to the Access Point created by the inverter system: the name of
the wireless network created by the system that the connection
should be established with, will be: ABB-XX-XX-XX-XX-XX-XX
where "X" is a hex digit of the wireless MAC address (MAC address
can be found on the "Communication Identification Label" placed on the
side of the inverter).
The screens shown below pertain to a tablet with the Android operating system. Screens on
other devices or operating systems may differ.
• When required digit the PRODUCT KEY (printed on the "Communica-
tion Identification label" and applied during the commissioning phase to
the plant documentation) as access point password.
Note that it's required to digit also the dash "-" characters of the
Product Key in the password field.
In case of need, product key can be recovered by Aurora Vision Cloud of by calling ABB tech-
nical support.
15
ABB-XX-XX-XX-XX-XX-XX
- 104 -
7 - Operation
to supply the inverter with input