Commissioning Via Web Ui - Wireless Connection - ABB PVS-120-TL Quick Installation Manual

Solar inverter, 100 to 120 kw
Hide thumbs Also See for PVS-120-TL:
Table of Contents

Advertisement

15.

COMMISSIONING VIA WEB UI - WIRELESS CONNECTION

Connection to the inverter - wireless
Commissioning could be carried out via wireless connection to the inverter's Web User Interface. Initial setup of the system must therefore be carried
out via a tablet, notebook or smartphone with a wireless connection.
• Close the DC disconnect switches
Make sure irradiation is stable and adequate for the inverter commissioning procedure to be completed.
• Once powered, the inverter will automatically create a wireless network (approx. 60 seconds after its switch-on).
• Enable the wireless connection on the device which is being used for the board setup (tablet, smartphone or PC) and connect it to the Access Point
created by the inverter system: the name of the wireless network created by the system that the connection should be established with, will be:
ABB-XX-XX-XX-XX-XX-XX
where "X" is a hex digit of the wireless MAC address (MAC address can be found on the "Communication Identification Label" placed on the side of
the inverter).
The screens shown below pertain to a tablet with the Android operating system. Screens on other devices or operating systems may differ.
• When required digit the PRODUCT KEY (printed on the "Communication Identification label" and applied during the commissioning phase to the
plant documentation) as access point password.
Note that it's required to digit also the dash "-" characters of the Product Key in the password field.
In case of need, product key can be recovered by Aurora Vision Cloud of by calling ABB technical support.
Commissioning procedure - wireless connected
• Open an internet browser (recommended browser: Chrome versions from v.55, Firefox versions from v.50) and enter the pre-set IP address
192.168.117.1 to access the Web User Interface.
Web User interface has easy commissioning wizard to commission the inverter.
The language of the wizard could be changed by clicking on the upper status bar
The required informations during the procedure are:
to supply the inverter with input voltage from the photovoltaic generator.
15
ABB-XX-XX-XX-XX-XX-XX
STEP 1 - Administrator/User login credentials
- Set the Administrator account user and password (minimum 8 character for password):
Administrator account can open and view the contents of photovoltaic site. Additionally, they can make
changes to inverter settings.
User and password are CASE SENSITIVE.
- Set the User account user and (optional) password (minimum 8 character for password):
User account can only read data. It cannot make any changes.
User and password are CASE SENSITIVE.