ASSEMBLY INSTRUCTIONS
STEP 1:
Attach the Front Stabilizer (No. 21) to the
Seat Rail (No. 3) with 2 Bolts (No. 35), 2
Arc Washers (No. 50), 2 Spring Washers
(No. 49), and 2 Dome Nuts (No. 38).
Attach the Rear Stabilizer (No. 2) to the Seat
Rail (No. 3) with 3 Inner Hex Screws (No.
40), 3 Spring Washer (No. 49), 2 Flat
Washers (No. 46) and 1 Arc Washer (No.
50).
STEP 2:
Insert Long Shaft (No. 8) into the Seat Rail
(No. 3), and insert the Spacers (No. 14)
onto the Long Shaft (No. 8) on both ends.
Then slide the Pedals (No. 15) onto each
side of the Long Shaft (No. 8) and secure
with the Flat Washer (No. 46) and Inner
Hex Screw (No. 40) and tighten.
Insert the Meter (No. 27) onto the meter
support on the Seat Rail (No. 3). Then
connect the Sensor Wire (No. 28) with the
Meter (No. 27) wire.
STEP 3:
Attach the Left and Right Handlebar
(No. 4 & 5) to the Connecting Joint (No.
6) with Inner Hex Screw (No. 42), Flat
Washer (No. 46) and Nut (No. 36). Then
secure the Junction Piece (No. 7) with
the Knob (No. 29).
5