Unpacking - Barnstead F46110CM Operation Manual And Parts List

High temperature muffle furnace
Hide thumbs Also See for F46110CM:
Table of Contents

Advertisement

Unpacking

Visually check for any physical damage to the shipping
container. Inspect the equipment surfaces that are
adjacent to any damaged area. Open the furnace door
and remove packing material from inside the furnace
chamber. Vacuum the chamber prior to use to remove
the insulation dust due to shipment. A hearth plate is
supplied with the furnace to be placed on bottom of fur-
nace chamber.
Retain the original packaging material if reshipment is
foreseen or required.
11

Advertisement

Table of Contents
loading

Table of Contents