Decommissioning The Sunny Island - SMA SUNNY ISLAND 3.0M Operating Manual

Sunny remote control
Hide thumbs Also See for SUNNY ISLAND 3.0M:
Table of Contents

Advertisement

12 Decommissioning the Sunny Island

12 Decommissioning the Sunny Island
Danger to life from electric shock due to high voltages
High voltages are present inside the Sunny Island. When the enclosure lid is removed, live components can be
touched that can result in death or serious injury due to electric shock.
• Disconnect the Sunny Island from voltage sources (see Section 9, page 45).
1. Ensure that the Sunny Island is disconnected from all voltage sources (see Section 9, page 45).
2. Remove all cables from the Sunny Island.
3. Close the Sunny Island.
4. Remove the ventilation grids laterally.
5. If the Sunny Island is protected against theft, loosen the
security screws.
6. Loosen the screws on both sides between the Sunny Island and
the wall mounting bracket using a hex key (AF 5).
100
SI30M-44M-60H-80H-BE-en-33
SMA Solar Technology AG
Operating Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny island 6.0hSunny island 4.4mSunny island 8.0h

Table of Contents