Validation And Commissioning - Webasto DUAL TOP RHA 100 Installation Manual

Integrated heater
Hide thumbs Also See for DUAL TOP RHA 100:
Table of Contents

Advertisement

Validation and commissioning

19
Validation and commissioning
Following completion of the installation and successful commissioning of
the heater, the warranty card contained in the operating instructions must
be filled out by the installation partner.
Warranty Card (see booklet Operating Instructions)
Consists of 2 parts:
WARRANTY CERTIFICATE:
Should remain with customer (in booklet).
CONTROL CARD:
Must be sent to the Webasto national company by the installation
partner.
The installation partner fills in the respective technical information and
the installation date for its customer and applies its stamp.
The installation partner retains a copy.
NOTE
Additional checklists and blank templates can be downloaded via the We-
basto Dealer Portal (http://dealers.webasto.com) if necessary.
120

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dual top rha 102Dual top rha 101

Table of Contents