Validation And Commissioning - Webasto DUAL TOP RHA 100 Installation Instructions Manual

Integrated heater
Hide thumbs Also See for DUAL TOP RHA 100:
Table of Contents

Advertisement

Validation and commissioning

19
Validation and commissioning
International service and warranty
All Dual Top installation/application releases shall be commissioned and
validated by authorized and certified technician according Dual Top
Commissioning & Validation (DCV) report and completely documented. In
case of OEM installations this applies always but only for the first released
representative applications. Installer shall deliver the documentation and
send this to the subsidairy for registration into central intranet server and
to support the quality of international service for the customer.
Dual Top systems being validated comply with International Webasto
Warranty Terms & Conditions. This means that the application can be
offered to the Webasto Recreational Vehicle Service Network worldwide
and that repairs will be processed according the national warranty
conditions.
Warranty Card / Dual Top Commissioning (DCV) Certificate
For this purpose there are 2 documents (A and B) that shall be supplied:
• Warranty Card (see booklet Operating Instructions)
Consists of 2 parts:
WARRANTY CERTIFICATE:
Should remain with customer (in booklet).
(A) CONTROL CARD:
To be sent by customer to Webasto Product International BV, The
Netherlands.
Installer shall complete for customer with technical information,
installation date and stamp.
Installers keeps a copy.
46
• (B) DCV Certificate
This certificate shall be completed / signed by validation authority and
supplied to subsidiary. Blank DCV Certificates can be downloaded from
Webasto Dealer Portal:
http://dealers.webasto.com
Dual Top

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents