Preparing The Balance - UMS HYPROP Operation Manual

Hide thumbs Also See for HYPROP:
Table of Contents

Advertisement

Preparing the balance

Set-up
The balance should be set up on a vibration-free work place that is ideally
used for HYPROP measurements only.
Set up the balance horizontally.
Adjust the balance by turning the
balance feet. The air bubble should
be in the center of the level.
Connect the balance to the power
supply and computer and turn it on.
Connect the cable of the sensor
unit to the balance and fix it on the
magnet clamp.
Put the free end of the cable and the
plug on the balance. Push the "Tara"
button and set the display to zero.
Connect the sensor unit and put it on the
balance.
53 | Preparing the measurement
magnet
clamp

Advertisement

Table of Contents
loading

Table of Contents