Implementing The Tensio Shafts In The Sensor Unit - UMS HYPROP Operation Manual

Hide thumbs Also See for HYPROP:
Table of Contents

Advertisement

Click "Set Zero Point" and wait until the
recalibration has been finished.
Close the window by a click on "Close".
Note
For the offset realibration as well as for the following implementation of the tensio shafts please
connect the sensor unit directly to the PC. Do not use the connection balance - sensor unit.

Implementing the tensio shafts in the sensor unit

Put silicone tube on the ceramic tip of
the tensio shaft. Turn tensio shaft upside
down and fill it with deionized and de-
gassed water until a meniscus builds up.
Note
Fill tensio shaft only with degassed water otherwise air bubbles build up.
The ceramic of the tensio shafts must be kept wet.
For the following steps it is necessary to connect the sensor unit with the computer.
So you can monitor the pressure increase when you screw in the tensio shafts. And make
sure that the pressure sensors will not be damaged.
43 | Preparing the measurement

Advertisement

Table of Contents
loading

Table of Contents