44
en | Installing a Junction Box (VDA-AD-JNB)
12
Installing a Junction Box (VDA-AD-JNB)
12.1
Parts List
The junction box (VDA-AD-JNB) includes the following parts:
Quantity
1
1
4
4
4
4
1
1
1
12.2
Installation Requirements
–
12.3
Preparing for Installation
4
4
4
Figure 12.1: Loosen front cover screws
4
4
2015.11 | 1.1 |
Item
Junction box
Torx screwdriver
Screws, M4 (for the innermost set of holes on the front cover)
Screws and washers, M6 (to mount the box to a wall)
Screws and washers, M8 (for the middle set of holes on the front cover)
Screws, M10 (for the middle set of holes on the back cover)
3/4 x 260 in. Roll Teflon Tape
5g Container Silicon Grease
Installation Manual
The wall is thick enough to install the mounting screws.
Determine a secure location for the junction box. Ensure there is an adequate opening in
the mounting surface for the cables to pass through.
Loosen the front cover screws with the supplied Torx screwdriver.
1
G 3/4
M25
To mount the junction box directly to a wall, use the outermost set of holes on the back
of the junction box as a template to mark the location on the wall to drill holes for the
four mounting screws (supplied).
Drill the holes.
3
G 3/4
M25
2
Installation Manual
AUTODOME IP 4000 HD
Bosch Security Systems