Wiring Method - Mitsubishi Electric GT15-J61BT13 User Manual

Got2000/got1000 series cc-link communication unit
Table of Contents

Advertisement

6. WIRING METHOD

The following diagram shows how to wire the GOT and CC-Link system modules.
(1) Wiring the GOT and CC-Link system modules by CC-Link dedicated
cable
Terminal
resistor
When connecting the CC-Link dedicated cables of the previous station and next
station, strip the wire sheaths off for 10mm (0.39 inch) and insert the cables into
the terminal block socket with every two wires in the same color together.
When connecting the braid shields of the CC-Link dedicated cables of the
previous station and the next station, caulk each braid shield to the supplied
solderless terminal (Plate type), then insert the shields into the terminal block
socket.
Solderless terminal
(Plate type)
Master module
(Blue)
DA
(Yellow)
DB
(White)
DG
CC-Link
SLD
dedicated
FG
cable
Braid shield
GOT
DA
DB
DG
SLD
CC-Link
dedicated
FG
cable
DG DB
FG SLD
Braid
shield
14
I/O module, etc.
DA
DB
Terminal
DG
resistor
SLD
FG
DA
10mm
(0.39inch)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1d7m57

Table of Contents