Download Print this page
Claypaky C61505 Instruction Manual

Claypaky C61505 Instruction Manual

Scenius profile

Advertisement

Quick Links

INDEX
Page
Contents
2
3
4
5
7
20
S ENIUS PROFILE
INSTRUCTION MANUAL
Congratulations on choosing a Claypaky product
We thank you for your custom.
Please note that this product, as all the others in the rich
Claypaky range, has been designed and made with total quality
to ensure excellent performance and best meet your
expectations and requirements.
1
C61505

Advertisement

loading
Need help?

Need help?

Do you have a question about the C61505 and is the answer not in the manual?

Questions and answers

Summary of Contents for Claypaky C61505

  • Page 1: Table Of Contents

    We thank you for your custom. Please note that this product, as all the others in the rich Safety information Claypaky range, has been designed and made with total quality Unpacking and preparation to ensure excellent performance and best meet your expectations and requirements.
  • Page 2: Safety Information

    SAFETY INFORMATION SAFETY INSTRUCTIONS IMPORTANT: Claypaky recommends you carefully read and keep the safety information on this product, also available in digital format at the following link: http://www.claypaky.it/en Ref: [FIS00L – Safety Information Scenius] INFORMAZIONI DI SICUREZZA IMPORTANTE: Claypaky raccomanda di leggere accuratamente e conservare le informazioni di sicurezza relative a questo prodotto, sempre reperibili in versione digitale al seguente link: http://www.claypaky.it/en/download...
  • Page 3: Unpacking And Preparation

    UNPACKING AND PREPARATION 2 x 183102/805 LAM00I (fitted into fixture) Packing contents - Fig. 1 UNLOCKED LOCKED UNLOCKED LOCKED PAN Mechanism Lock and Release every 90°) - Fig. 2 TILT Mechanism Lock and Release every 45°) - Fig. 3 S ENIUS PROFILE...
  • Page 4: Installation And Start-Up

    INSTALLATION AND START-UP Installing the projector - Fig. 4 WARNING: with the exception of when the projector is positioned on the floor, the safety cable must be fitted. (Cod. 105041/003 available on request). The projector can be installed on the floor resting on special rubber feet, on a truss or on the ceiling or wall. This must be securely fixed to the support structure of the projector and then connected to the fixing point at the centre of the base.
  • Page 5: Control Panel

    CONTROL PANEL Mains Connecting to the mains supply - Fig. 6 DMX 512 5 PIN SCREEN SIGNAL SIGNAL Connecting to the control signal line DMX) - Fig. 7 Use a cable conforming to specifications EIA RS-485: 2-pole twisted, shielded, 120Ohm characteristic impedance, 22-24 AWG, low capacity. Do not use microphone cable or other cable with characteristics differing from those specified.
  • Page 6 Reversal of the display - Fig. 9 To activate this function, press UP and DOWN keys simultaneously while the display is in the rest mode. This status will be memorised and maintained even for the next time it will be switched on. To return to the initial state, repeat the operation all over again. Setting the projector starting address On each projector, the starting address must be set for the control signal (addresses from 1 to 512).
  • Page 7: Maintenance

    MAINTENANCE 1/4 Turn 1/4 Turn 1/4 Turn CLICK!! Locking and releasing Pan and Tilt movements - Refer to the instructions in the UNPACKING AND PREPARATION section. Opening the head covers - Fig. 10. Closing the head covers - Fig. 11. Continue S ENIUS PROFILE...
  • Page 8 • General cleaning of internal parts. • Restoring lubrication of all parts subject to friction, using lubricants specifically supplied by Claypaky. • General visual check of the internal components, cabling, mechanical parts, etc.
  • Page 9 Cleaning of the filters - Fig. 13. Continue S ENIUS PROFILE...
  • Page 10 1/4 Turn Cleaning of the filters - Fig. 14. S ENIUS PROFILE...
  • Page 11 Upper Side Upper Side Lower Side Extraction of the effect modules: Preliminary operations - Fig. 15. Continue S ENIUS PROFILE...
  • Page 12 Upper Side Lower Side Extraction of the effect modules: Preliminary operations - Fig. 16. S ENIUS PROFILE...
  • Page 13 Upper Side Extraction of the effect modules - Fig. 17. IMPORTANT: Grasp the modules using the support structure and not the details which could get damaged. Insertion of the effect modules: Repeat the operations indicated in Fig. 15, 16, 17, 18 and 19 in reverse order. Continue S ENIUS PROFILE...
  • Page 14 Upper Side Extraction of the effect modules - Fig. 18. IMPORTANT: Grasp the modules using the support structure and not the details which could get damaged. Insertion of the effect modules: Repeat the operations indicated in Fig. 15, 16, 17, 18 and 19 in reverse order. S ENIUS PROFILE...
  • Page 15 Upper Side Lower Side Lower Side Extraction of the effect modules - Fig. 19. IMPORTANT: Grasp the modules using the support structure and not the details which could get damaged. Insertion of the effect modules: Repeat the operations indicated in Fig. 15, 16, 17, 18 and 19 in reverse order. Continue S ENIUS PROFILE...
  • Page 16 Upper Side Lower Side Lamp change - Fig 21 WARNING: do not touch the lamp’s envelope with bare hands. Take the new lamp out of its package and insert in the fitting. Should this happen, clean the bulb with a cloth soaked in alcohol and dry it with a clean, dry cloth.
  • Page 17 Replacing rotating gobos ø 32.8 mm - max 23 mm image – thickness 1.1 mm) Fig. 24 - Before use custom gobos contact Claypaky; - The original gobos have a special coating designed specifically to resist to the high temperatures;...
  • Page 18 Pos. 8 Pos. 1 GOD00F/001 GOD00F/009 Pos. 7 GOD003/011 GOD00F/007 Pos. 2 Pos. 6 GOD00F/002 GOD00F/005 Pos. 3 Pos. 5 Pos. 4 GOD00F/003 GOD00F/004 Replacing fixed gobos ø 31.5 mm - max 23 mm image - thickness max 1,1 mm) - Fig. 25 IMPORTANT: Please contact CLAY PAKY before using customized gobos.
  • Page 19 Battery removal - Fig. 27 This product contains a rechargeable lithium iron tetraphosphate battery. To preserve the environment, please dispose the battery at the end of its life according to the regulation in force. LiFePO4 S ENIUS PROFILE...
  • Page 20: Technical Information

    • Rotating prism with 4 faces TILT FINE Resolution: 0.00409° • 16 blades fast iris Accuracy: • Variable "soft edge" frost Resolution ± 0.1° (Range 0.2°) CLAYPAKY - Via Pastrengo, 3/b - 24068 Seriate (BG) Italy - Tel. +39-035-654311 - Fax +39-035-301876 - www.claypaky.it S.p.A.