In-Deck Mounting; Slide Plumbing Instructions - S.R.Smith Rogue 2 Assembly And Installation Instructions Manual

Table of Contents

Advertisement

not to run the drill bit into the 1/4" bolt. Push the cap screw completely through the slide leg.
Install the (#25) 1/4" x 5/8" Flat Washers and (#26) 1/4"-20UNC Hex Lock Nuts (see Figure 25).

IN-DECK MOUNTING

22) Insert 3/8" (9.5 mm) diameter rebar (not provided) into the holes located at the bottom of
each leg making sure that the rebar will be a minimum of three inches (3") below the deck
surface.
23) Bond slide per local codes (see ELECTRICAL BONDING page 18).
24) Secure the ladder so that the ladder steps are level, from side to side, and the ladder is held at
15 degrees (0.26 radians) from vertical.
25) Secure the slide to prevent the movement during the concrete pour to ensure that the slide
position remains the same.
26) SUGGESTION: To ensure easy removal of concrete from legs and ladder, wax or wrap with wax
paper approximately 12 inches (305 mm) above deck level.
27) Proceed with pouring the concrete deck and finish as desired. Let concrete cure per concrete
manufactures directions before using slide.

SLIDE PLUMBING INSTRUCTIONS

Entrance piece hose
channel for plumbing
22
Figure 12
14
3

Advertisement

Table of Contents
loading

Table of Contents