Texas Instruments TPS65010EVM-230 User Manual
Texas Instruments TPS65010EVM-230 User Manual

Texas Instruments TPS65010EVM-230 User Manual

Pmp portable power

Advertisement

Quick Links

TPS65010EVM-230
U
s e
r ' s
G
u
i d
e
User's Guide
2003
PMP Portable Power
SLVU095A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS65010EVM-230 and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPS65010EVM-230

  • Page 1 TPS65010EVM-230 r ' s User's Guide 2003 PMP Portable Power SLVU095A...
  • Page 2 TI product or service and is an unfair and deceptive business practice. TI is not responsible or liable for any such statements. Following are URLs where you can obtain information on other Texas Instruments products & application solutions:...
  • Page 3 EVM IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation kit being sold by TI is intended for use for ENGINEERING DEVELOPMENT OR EVALUATION PURPOSES ONLY and is not considered by TI to be fit for commercial use. As such, the goods being provided may not be complete in terms of required design–, marketing–, and/or manufacturing–...
  • Page 4 EVM schematic located in the EVM User’s Guide. When placing measurement probes near these devices during operation, please be aware that these devices may be very warm to the touch. Mailing Address: Texas Instruments Post Office Box 655303 Dallas, Texas 75265 Copyright 2003, Texas Instruments Incorporated ...
  • Page 5: How To Use This Manual

    About This Manual This User’s Guide describes the characteristics, operation, and use of the TPS65010EVM-230 evaluation module (EVM), which helps you evaluate and test the various operating modes of the TPS65010. The guide includes setup instructions for the hardware and software, a schematic diagram, a bill of materials (BOM), and PCB layout drawings for the evaluation module.
  • Page 7: Table Of Contents

    Contents Read This First ......................... v About This Manual...................... v How to Use This Manual .................... v Related Documentation From Texas Instruments............v If You Need Assistance ....................v FCC Warning......................v Contents ......................... vii Figures..........................vii Tables ..........................vii Introduction ........................1-1...
  • Page 8 viii...
  • Page 9: Introduction

    Chapter 1 Introduction The Texas Instruments TPS65010EVM-230 is an integrated power and battery management integrated circuit for applications that are powered with one Li-Ion or Li-Polymer cell and require multiple power rails. The TPS65010 contains two highly efficient switching step-down converters, two LDOs, a battery charger, and additional status and I/O pins.
  • Page 10: 1.1 Requirements

    TPS65010 internal registers through the USB port. ❏ ❏ ❏ ❏ Printed circuit board assembly The TPS65010EVM-230 PCB contains the TPS65010 IC and its required external components. This board contains several jumpers and connectors that enable you to customize the board for specific operating conditions.
  • Page 11 Introduction When installing from a CD: 1) Insert the CD, it should start up automatically. If not, run the Start.bat file on the CD. 2) Install the TPS65010EVM controller program from the main menu first. 3) Install the USB drivers next. (Be sure the EV2300 board is not connected to your computer).
  • Page 12 Introduction...
  • Page 13: Setup

    Chapter 2 Setup This chapter describes the jumpers and connectors on the EVM and how to properly connect, setup, and use the TPS65010EVM-230. Topic Page 2.1 Input/Output Connectors 2.2 Setup...
  • Page 14: Input/Output Connectors

    Setup 2.1 Input/Output Connectors Table 2-1 lists the input/output connectors Table 2-1. Input/Output Connectors Setup Connection Description J1-USB USB charger input/output header can be used as either an input or an output. If R6 is opened, then J1 can be used as an input. An external 5 V can be supplied to the EVM to simulate the USB 5-V bus.
  • Page 15: Setup

    Setup Setup Connection Description J17-LDO1 Input/output connection for LDO1. VINLDO1 can be connected to an external supply or connected to another output voltage on the EVM. The EVM default configuration connects VMAIN to VINLDO1. Remove R25 if a voltage other than VMAIN is used as input to VINLDO1.
  • Page 16 Setup...
  • Page 17: Board Layout

    Chapter 3 Board Layout This chapter provides the TPS65010EVM-230 board layout and illustrations. Topic Page 3.1 Layout...
  • Page 18: 3.1 Layout

    3.1 Layout Board layout is critical for all switch mode power supplies. Figures 1-5 show the board layout for the TPS65010EVM-230 PWB. The nodes with high switching frequencies and currents are short and are isolated from the noise sensitive feedback circuitry. Careful attention has been given to the routing of high frequency current loops.
  • Page 19: Figure 3-2. Top Layer Routing

    Board Layout Figure 3-2. Top Layer Routing Figure 3-3. Layer 2 Routing...
  • Page 20: Figure 3-4. Layer 3 Routing

    Board Layout Figure 3-4. Layer 3 Routing Figure 3-5. Bottom Layer Routing...
  • Page 21: Schematic And Bill Of Materials

    Chapter 4 Schematic and Bill of Materials This chapter provides the TPS65010EVM-230 schematic and bill of materials. Topic Page 4.1 Schematic 4.2 Bill of Materials...
  • Page 22: Schematic

    Schematic and Bill of Materials 4.1 Schematic Shows the TPS65010EVM-230 schematic Figure 4-1. TPS65010EVM-230 Schematic...
  • Page 23: Bill Of Materials

    Schematic and Bill of Materials 4.2 Bill of Materials Table 4-1. Bill of Materials. Count Ref Des Description Size Part Number Capacitor, Ceramic, C1, C5 C2012X5R0J106KT 10-uF, 6.3-V, X5R, 10% Capacitor, Ceramic, 1210 C3225X5R1C106KT 10-uF, 16-V, X5R, 10% Capacitor, Ceramic, C3, C8 C2012X5R0J225KT 2.2-uF, 6.3-V, X5R, 10%...
  • Page 24 Schematic and Bill of Materials Count Ref Des Description Size Part Number Resistor, Chip, 511 k-Ω, 1/16-W, 1% Resistor, Chip, 110k-Ω, 1/16-W, 1% R4, R6, Resistor, Chip, xx-Ω, R14, R15, 1/16-W, 1% R24, R28 Switch, SPST, PB Momentary, 0.245 X S1, S2 C &...

Table of Contents