Download  Print this page

Texas Instruments TPS65020EVM-110 User Manual

Evaluation module (evm)
Hide thumbs

Advertisement

This User's Guide describes the characteristics, operation, and use of the
TPS65020EVM-110 evaluation module (EVM). This EVM is designed to help the user
evaluate and test the various operating modes of the TPS65020. This User's Guide
includes setup instructions for the hardware and software, a schematic diagram, a bill
of materials (BOM), and PCB layout drawings for the evaluation module.
1
2
3
4
5
1
2
3
4
5
6
1
1
Introduction
The Texas Instruments TPS65020EVM is an integrated Power Management IC for applications that are
powered with one Li-Ion or Li-Polymer cell, and require multiple power rails. The TPS65020 contains three
highly efficient switching step-down converters, two LDOs, and additional status and I/O pins. The device
is controlled via an I
1.1
Requirements
In order for this EVM to operate properly, the following components must be connected, and properly
configured.
1.2
Personal Computer (PC)
A computer with a USB port is required to operate this EVM. The TPS65020 interface software, which is
run on the PC, communicates with the EVM via the PC USB port. The user sends commands to the EVM
as well as reads the contents of the TPS65020 internal registers through the USB port.
2
I
C is a trademark of Philips Electronics.
SLVU138 - August 2005
..........................................................................................
.................................................................................................
........................................................................................
..........................................................................
.....................................................................................
............................................................................................
................................................................................
.................................................................................
.............................................................................
....................................................................................
2
C™ interface.
TPS65020EVM-110 User's Guide
...................................................................
List of Figures
...................................................................
List of Tables
User's Guide
SLVU138 - August 2005
1
2
3
8
10
4
5
6
7
8
9
10
TPS65020EVM-110 User's Guide
1

Advertisement

Table of Contents
loading

  Related Manuals for Texas Instruments TPS65020EVM-110

  Summary of Contents for Texas Instruments TPS65020EVM-110

  • Page 1: Table Of Contents

    HPA110A BOM Introduction The Texas Instruments TPS65020EVM is an integrated Power Management IC for applications that are powered with one Li-Ion or Li-Polymer cell, and require multiple power rails. The TPS65020 contains three highly efficient switching step-down converters, two LDOs, and additional status and I/O pins. The device is controlled via an I C™...
  • Page 2: Setup

    EV2300 receives the information on the I Software Texas Instruments has provided software to assist the user in evaluating this EVM. To install the software, insert the enclosed CD into your computer. The software should start automatically. If it does not, simply go to <Start>, <Run>, and type “D:\SLVU138.exe”, and click <OK>...
  • Page 3: Board Layout

    5. Connect the USB cable between the computer and the EVM. 6. Turn on all supplies and loads. 7. Run the TPS65020EVM software. Board Layout This section provides the TPS65020EVM-110 board layout and illustrations. SLVU138 – August 2005 DESCRIPTION TPS65020EVM-110 User's Guide Board Layout to GPIO1.
  • Page 4: Assembly Layer

    Board layout is critical for all switch mode power supplies. layout for the TPS65020EVM-110 PWB. The nodes with high switching frequencies and currents are short and are isolated from the noise sensitive feedback circuitry. Careful attention has been given to the routing of high frequency current loops.
  • Page 5: Top Layer

    Board Layout Figure 2. Top Layer SLVU138 – August 2005 TPS65020EVM-110 User's Guide...
  • Page 6: Routing, Gnd Plane

    Board Layout Figure 3. Routing, GND Plane TPS65020EVM-110 User's Guide SLVU138 – August 2005...
  • Page 7: Routing, Vin Plane

    Board Layout Figure 4. Routing, VIN Plane SLVU138 – August 2005 TPS65020EVM-110 User's Guide...
  • Page 8: Schematic And Bill Of Materials

    Schematic and Bill of Materials Schematic and Bill of Materials This section provides the TPS65020EVM-110 schematic and bill of materials. TPS65020EVM-110 User's Guide Figure 5. Routing, Bottom Layer www.ti.com SLVU138 – August 2005...
  • Page 9: Tps65020Evm-110 Schematic

    Schematic and Bill of Materials Schematic Figure 6. TPS65020EVM-110 Schematic SLVU138 – August 2005 TPS65020EVM-110 User's Guide...
  • Page 10: Related Documentation

    100k SW1, SW2 Related Documentation 1. TPS65020, Power Management IC for Li-Ion Powered Systems data sheet, TPS65020EVM-110 User's Guide Table 1. HPA110A BOM Description Capacitor, ceramic, 10 F, 6.3 V, X5R, 20% Capacitor, ceramic, 2.2 F, 6.3 V, X5R, 10% Capacitor, Ceramic, 1.0 F, 6.3 V, X5R,10%...
  • Page 11 EVM IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation kit being sold by TI is intended for use for ENGINEERING DEVELOPMENT OR EVALUATION PURPOSES ONLY and is not considered by TI to be fit for commercial use. As...
  • Page 12 EVM schematic located in the EVM User's Guide. When placing measurement probes near these devices during operation, please be aware that these devices may be very warm to the touch. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 TPS65020EVM-110 User's Guide EVM WARNINGS AND RESTRICTIONS Copyright ©...
  • Page 13: Important Notice

    TI as compliant with ISO/TS 16949 requirements. Buyers acknowledge and agree that, if they use any non-designated products in automotive applications, TI will not be responsible for any failure to meet such requirements. Following are URLs where you can obtain information on other Texas Instruments products and application solutions: Products Amplifiers amplifier.ti.com...