Valor StoneFire SFMK01 Installation Instructions Manual page 3

Stonefire inner frame kit
Table of Contents

Advertisement

Available languages

Available languages

FRAMING
Note: These instructions are in addition to installation instructions supplied with Valor 530
firebox unit. Any combustible framing construction must be clear of standoffs.
A non-combustible hearth is not necessary in front of this appliance.
The 530 fireplace is approved to install directly on wood sub-flooring.
Any combustible framing construction must be clear of standoffs.
The wall board opening
MUST be a minimum of
27-1/2" wide x 36-1/4" high
Section of mantel,
wall finish &
framing kit
Framing Diagram
Wall finish
Mantel top*
Header
Top cover*
530 engine
Sheet metal frame dimensions
Detail of section of mantel top,
wall finish & framing kit
(side view)
Top cover*
Duct
Shield
*Mantel top hooks on
the top cover lip; top
cover is fixed on each
side to wood frame
Header
3

Advertisement

Table of Contents
loading

Table of Contents