EMC CX3-10 Field Installation Manual page 9

Rails and enclosures
Table of Contents

Advertisement

Figure 4
EMC Rails and Enclosures (CX3-10 Class and CX3-20 Class Storage Systems) Field Installation Guide
2. From the front of the cabinet, insert the alignment pin on the right
mounting rail assembly into the middle hole of the selected 1U
space on a rear channel.
for the alignment pins.
Aligning pins in a 1U section on the cabinet rear rails
Installing a 1U storage processor enclosure (SPE3) in a cabinet
Figure 4
shows the correct channel holes
Alignment Pin
Here
1U
EMC292
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx3-20

Table of Contents