EMC CX3-10 Field Installation Manual page 10

Rails and enclosures
Table of Contents

Advertisement

Installing a 1U storage processor enclosure (SPE3) in a cabinet
Screw (1)
Figure 5
EMC Rails and Enclosures (CX3-10 Class and CX3-20 Class Storage Systems) Field Installation Guide
10
Refer to
Figure 5
as you perform steps
3. Pull the adjustable rail forward to the inner side of the front
channel (the surface facing the rear of the cabinet), and align the
three holes on the rail with those in the channel.
4. Secure the rail to the front channel using one of the provided
screws at the top hole of the rail. Leave the screw slightly loose to
allow for adjustment after you install the enclosure.
5. Repeat steps
2
6. From the rear of the cabinet, use two of the provided screws to
secure each rail to the rear channel. Tighten the screws.
Adjustable rail
Left front
Mounting rail
Installing the adjustable mounting rails
3
through
4
on the left side, with the left rail.
Alignment pin
Front
through 6.
Alignment pin
Right rear
Screw (2)
Mounting rail
Alignment pin
EMC3430

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cx3-20

Table of Contents