Monthly Maintenance - Parker Parkrimp 2 – 83CE-083U Instruction Manual

Table of Contents

Advertisement

Hose Crimper Machine Parkrimp
Maintenance
Maintenance
6.2

Monthly maintenance

Monthly maintenance work may only be carried out by trained maintenance personnel
(setters).
Setters of hydraulic presses must be at least 18 years old and trained for the job, i.e.
must have taken part in a specific training.
The setter must not carry out any repair work on the plant!
Maintenance objects
Hydraulic energy lines
Hydraulic oil
Crimping tool
Table 6-2 Monthly maintenance
6-4
2
®
Actions (to be performed by operator)
Check
the hoses for porosity and leaks
the screw couplings and clamps for tightness
Check the hydraulic oil level in the hydraulic station (see fig-
ure 6-4).
Use only clean and filtered hydraulic oil type HLP 46 DIN
51524 (5) for oil changes.
Ventilate the plant after the hydraulic oil change:
open and close the tool several times.!
Check the crimping tool for proper condition and wear.
6-4
Bulletin 4480-T12/UK

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents