Hose Crimper Machine Parkrimp
Operation
Operation
5.2

Switching-on

Figure 5-5 Main switch On
5.3

Switching-off

Figure 5-6 Main switch Off
5.4

Restoring of power

5-2
2
®
The following requirements must be fulfilled before the plant can be
switched on:
The plant has been properly installed and first commis-
sioning has been performed by expert personnel (setter and skilled
electrician). The direction of rotation of the motor has been
checked.
The plant has been equipped with the suitable Parkrimp die set.
Die set, fitting and hose have been properly selected.
All tools and auxiliary equipment have been removed from the
plant.
Only the operator is allowed to stay in the working area of the
plant.
All emergency stop situations must have been rectified.
The operator has read and understood the instruction manual. He
has received the instruction manual from the user and follows the
instructions set out therein.
The operator is familiar with the safety regulations.
 Switch on the main switch.
The plant is now on.
 Finish the crimping cycle completely.
 Deposit the workpiece outside the plant.
 Switch off the main switch.
The plant is now off.
Restoring of power is the same operating sequence as switching-on
(chapter 5.1).